AKKUYU NUCLEAR POWER PLANT
Thanks to its unique design, due to its need for 1,200,000 ton/hr water flow requirement; the system requires longest, heaviest, widest units (both culverts and pipes) with 15 cm installation tolerance angular in 3 dimensions.